VANCOUVER (NEWS 1130) — Lanes have opened on the Alex Fraser Bridge in both directions. All lanes were shut down Friday because of ice falling off cables. At the time, the province said it is too windy to deploy the cable collar cleaning system. Traffic crawling across the #AlexFraserBridge after reports of ice/snow falling from the cables. Just one lane open NB, two lanes SB.

