Construction of Klang Valley mass rapid transit line 1 started in 2011. It included 51km of alignment and 31 stations, with 9.5km of track beneath the centre of Kuala Lumpur. SNC-Lavalin was involved as the independent consultant engineer. https:// bit.ly/2kkQ3Bo pic.twitter.com/kVNzkqxR59